|
Dec 03, 2024
|
|
|
|
2015-2016 Archived Catalog
|
ACHR-145 Duct System FabricationCredits 3 / 4 Contact Hours Prerequisite: Placement into RDNG-016 (ACSR-016) An introduction to the layout fabrication and installation of air-handling duct systems. A study of basic system designs system components and the duct fabrication process. Emphasis on sheet metal duct systems.
|
|